Key Takeaways
- Governing Scope: Construction Law No. 135/2025/QH15; Ministry of Construction Circular No. 34/2026/TT-BXD dated 25/06/2026 (Article 5).
- Key Benchmark: Clause 1, Article 5 of Ministry of Construction Circular No.
- Execution Control: State explicitly which grading circular and project approval date govern each evaluated reference contract.
01Regulatory Context & Core Scope
For new works tenders published after 01/07/2026, almost every similar completed contract listed by bidders on e-GP Form 05 involves projects constructed and accepted between 2021 and early 2026. Evaluators frequently ask whether those historical reference contracts must be re-graded retroactively under Circular No. 34/2026/TT-BXD or evaluated using the building grade established when each reference project was approved.
Clause 1, Article 5 of Ministry of Construction Circular No. 34/2026/TT-BXD dated 25/06/2026 answers this directly. Under that transitional provision, the building grade of any construction investment project approved by investment decision before 01/07/2026 remains governed by the legal rules effective at the date of investment approval.
02Effective Dates & Transitional Scope
Consequently, reference contracts approved before the transition cutoff retain their lawful grade established under Circular No. 06/2021/TT-BXD (and Circular No. 02/2025/TT-BXD where approved from 20/05/2025 onward) without retroactive downgrading.
Even so, evaluation panels must look beyond summary grades typed onto e-GP webforms and inspect supporting source records. Older construction contracts sometimes omit explicit grade references or contain clerical mislabeling, requiring evaluators to confirm the investment approval date and original building-grade designation from project approval decisions, economic-technical reports, or design appraisal notices.
03Qualification Benchmarks & Bidder Preferences
Where an older reference project underwent design revisions on or after 01/07/2026 without altering building importance, capacity scale, or structural scale, Point a, Clause 3, Article 5 preserves the initial investment-approval grade. Conversely, if a post-cutoff revision changed capacity or structural scale under Point b, Clause 3, Article 5, evaluators verify the re-determined grade under Circular No. 34/2026/TT-BXD.
Inside the evaluation report, panels should explicitly document both the circular governing the current tender package and the circular governing each reference contract alongside its original project approval date. That disciplined documentation protects fair treatment for bidders holding pre-cutoff experience while satisfying independent appraisal and audit reviews.
Checklist for Grading Pre-1 July 2026 Reference Contracts
- Check the investment-approval decision date for each completed reference project submitted by the bidder.
- Apply the transitional rule in Clause 1, Article 5 of Circular 34/2026/TT-BXD to preserve building grades approved before 01/07/2026 under former Circular 06/2021/TT-BXD or Circular 02/2025/TT-BXD.
- Verify whether post-01/07/2026 design revisions altered capacity or structural scale under Point b, Clause 3, Article 5.
- State explicitly which grading circular and project approval date govern each evaluated reference contract.
Legal Basis & Regulatory Scope
Construction Law No. 135/2025/QH15; Ministry of Construction Circular No. 34/2026/TT-BXD dated 25/06/2026 (Article 5); transitional reference to Circular No. 06/2021/TT-BXD (as amended by Circular No. 02/2025/TT-BXD) for contracts under projects approved before 01/07/2026; Government Decree No. 214/2025/ND-CP dated 04/08/2025 (Articles 29 and 30); Ministry of Finance Circular No. 79/2025/TT-BTC dated 04/08/2025.