STATUTORY PROCUREMENT SCOPE

Regulated Procurement Advisory Sectors

Comprehensive procurement advisory across all statutory tender categories, tailored to each project requirement under Bidding Law 22/2023/QH15, Decree 214/2025/ND-CP through Decree 349/2026/ND-CP, and Circular 79/2025/TT-BTC.

Construction Works Packages
SECTOR 01

Construction Works Packages

Civic and industrial buildings, factories, bridges, highways, hydraulic works, urban utilities, power, MEP, fire protection, renovations, and EPC contracts.

Civic & Industrial Plants Bridges & Highways Hydraulics & Flood Control Urban Utilities & Water Power, MEP & Fire Safety Renovations & Turnkey EPC
Formulates E-HSMT documents matching statutory project grading under Circular 34/2026/TT-BXD and Circular 79/2025/TT-BTC.
Calibrates similar-contract thresholds fairly to technical grade without artificial barriers.
Evaluates construction method statements, critical-path schedules, key personnel, and equipment deployment.
Cross-checks bills of quantities against issued design drawings and approved budgets.
Goods Procurement Packages
SECTOR 02

Goods Procurement Packages

Medical apparatus, pharmaceuticals and diagnostic reagents, enterprise IT and software, machinery, specialized vehicles, instructional gear, furniture, and supplies.

Medical Equipment Pharma & Lab Reagents Enterprise IT & Software Industrial Machinery Specialized Vehicles Education & Office Goods
Drafts functional performance specifications without restricting competition to specific brand names.
Audits CO and CQ certification requirements and sector compliance documentation.
Assesses delivery schedules, installation commissioning, training, and warranty service commitments.
Applies evaluated-bid or life-cycle costing criteria suited to complex equipment.
Consulting Services
SECTOR 03

Consulting Services

Urban planning, surveys, feasibility studies, technical design, peer review, project management, supervision, quality testing, independent audit, valuation, and IT consulting.

Planning & Surveys Feasibility & Design Design Peer Review PM & Construction Supervision Audit & Valuation Digital & IT Advisory
Structures combined technical-financial or quality-based scoring under Decree 214/2025/ND-CP.
Validates lead practitioner licenses across architecture, structural, MEP, and valuation disciplines.
Assesses methodology depth, work plans, staffing allocation, and deliverable milestones.
Evaluates two-envelope technical and financial proposals in line with Circular 79/2025/TT-BTC.
Non-Consulting Services
SECTOR 04

Non-Consulting Services

Hospital sanitation, building cleaning, security guarding, catering, building MEP O&M, wastewater plants, IT service leasing, events, freight, insurance, and landscaping.

Hospital Sanitation Security Services Institutional Catering MEP & Plant O&M Managed IT Leasing Events & Conferences Logistics & Insurance Urban Landscaping
Defines measurable SLA benchmarks, staffing shifts, and minimum service equipment rosters.
Incorporates occupational health, liability insurance, and incident escalation terms.
Reviews recurring labor, consumables, and overhead pricing structures for budget predictability.
Establishes transparent monthly or quarterly performance sign-off metrics.
REGULATORY ALIGNMENT

Current e-GP Templates & Reporting Standards

All e-GP bidding documents follow Circular 79/2025/TT-BTC, while Bid Evaluation Reports (Form 02A) and Appraisal Reports follow Circular 134/2026/TT-BTC alongside applicable amendments from Decree 165/2026/ND-CP, Decree 170/2026/ND-CP, and Decree 349/2026/ND-CP.

Procurement Advisory Service Request E-HSMT Review