Key Takeaways
- Governing Scope: Law on Procurement No. 22/2023/QH15 as amended by Laws No. 57/2024/QH15, 90/2025/QH15, and 142/2025/QH15 (Clause 3, Article 44); Government Decree No. 214/2025/ND-CP.
- Key Benchmark: 79/2025/TT-BTC and Clause 3, Article 44 of Law No.
- Execution Control: Verify that shipping, installation, load testing, and statutory inspection fees are accounted for in the bid price breakdown.
01Regulatory Context & Core Scope
In tenders for imported industrial production lines, heavy lifting equipment, boilers, pressure vessels, or large generators, E-HSMT drafters frequently confuse bid-stage capability criteria with post-installation statutory safety inspection requirements. Requiring bidders to submit a domestic Vietnamese safety inspection certificate inside the E-HSDT for brand-new equipment not yet imported is practically impossible and violates open-competition principles.
02Pricing Methodology & Cost Controls
Under Decree No. 44/2016/ND-CP and the regulatory list under Circular No. 36/2019/TT-BLDTBXH, bridge cranes, hoists, motorized forklifts, elevators, boilers, and pressure vessels fall under strict occupational safety controls. However, initial technical safety inspection takes place only after the equipment clears customs, completes site installation in Vietnam, and undergoes load or pressure testing prior to operational commissioning.
Accordingly, E-HSMTs drafted under Circular No. 79/2025/TT-BTC and Clause 3, Article 44 of Law No. 22/2023/QH15 should structure criteria in two clear layers. Inside Chapter III qualification tables, evaluators test prior completed contracts for comparable turnkey industrial equipment supply and installation, average turnover, financial capacity, and installation engineers holding valid electrical and occupational safety credentials.
03Qualification Benchmarks & Bidder Preferences
Inside Chapter V technical specifications and draft contract terms, the E-HSMT mandates that the awarded contractor deliver customs import declarations, factory Certificates of Origin, and Certificates of Quality at delivery, and engage a licensed inspection organization under Decree No. 44/2016/ND-CP to complete initial safety certification before formal acceptance handover.
During bid evaluation under Decree No. 214/2025/ND-CP, panels must never disqualify bidders for lacking domestic inspection certificates on unimported new machinery; instead, panels audit synchronous supply commitments, manufacturer datasheets, and verified past commissioning references.
Checklist for Imported Equipment Capability and Safety Inspections
- Cross-check Circular No. 36/2019/TT-BLDTBXH to identify machinery categories requiring strict safety inspection.
- Keep Chapter III focused on prior supply-installation contracts, financial standing, and qualified technicians without pre-closing inspection papers for new imports.
- Place import-clearance records and initial Decree No. 44/2016/ND-CP safety inspection duties inside Chapter V acceptance terms.
- Verify that shipping, installation, load testing, and statutory inspection fees are accounted for in the bid price breakdown.
Legal Basis & Regulatory Scope
Law on Procurement No. 22/2023/QH15 as amended by Laws No. 57/2024/QH15, 90/2025/QH15, and 142/2025/QH15 (Clause 3, Article 44); Government Decree No. 214/2025/ND-CP dated 04/08/2025 (Article 26; Clause 1, Article 29); Ministry of Finance Circular No. 79/2025/TT-BTC dated 04/08/2025 (Clause 5, Article 26); Government Decree No. 44/2016/ND-CP dated 15/05/2016; Ministry of Labor, Invalids and Social Affairs Circular No. 36/2019/TT-BLDTBXH dated 30/12/2019.