Key Takeaways
- Governing Scope: Law on Procurement No. 22/2023/QH15 as amended by Laws No. 57/2024/QH15, 90/2025/QH15, 116/2025/QH15, 133/2025/QH15, and 142/2025/QH15 (Clause 3, Article 44); Constr.
- Key Benchmark: From 01/07/2026 onward, when establishing similar-contract criteria under Ministry of Construction Circular No.
- Execution Control: Define phased room-by-room site handover schedules inside draft contract execution terms.
01Regulatory Context & Core Scope
Renovation and repair tenders inside operating public hospital wards, surgical suites, and outpatient clinics create two distinct E-HSMT challenges: avoiding misapplied building-grade thresholds that restrict competition while mandating strict infection-control and noise-containment measures next to active patient care.
02Pricing Methodology & Cost Controls
From 01/07/2026 onward, when establishing similar-contract criteria under Ministry of Construction Circular No. 34/2026/TT-BXD, hospital investors must separate structural interventions from routine upkeep. Under Point b, Clause 4, Article 2, renovations altering load-bearing structures or functional scale require re-grading under Annexes I and II, whereas works leaving grading criteria untouched retain the existing hospital grade.
Crucially, for wall repainting, anti-bacterial flooring replacement, doors, low-voltage electrical repairs, or building-equipment servicing under maintenance budgets that leave load-bearing structures unaffected, Clause 5, Article 3 of Circular No. 34/2026/TT-BXD states that building grades do not apply. Consequently, maintenance E-HSMTs must not demand new Grade I or Grade II hospital construction experience, setting instead comparable civil-finishing or maintenance contract values compliant with Clause 3, Article 44 of Law No. 22/2023/QH15.
03Sector Technical Rules & Supporting Evidence
Inside Chapter V technical specifications, E-HSMT drafters should define measurable hospital-environment controls: dust-tight containment partitions approved by the infection-control unit, material and waste haulage paths separated from patient elevators, verified isolation of medical-gas lines and backup power circuits before tie-ins, and strict scheduling of noisy demolition outside clinic and patient rest hours.
To prevent schedule claims during phased ward handovers, contract terms and progress schedules should map rolling work zones explicitly. Balancing realistic non-structural maintenance criteria with rigorous site-safety specifications enables hospitals to select qualified clean-renovation contractors without unlawfully narrowing tender participation.
Checklist for Active Hospital Ward Renovation E-HSMT
- Review design files to apply Clause 5, Article 3 of Circular No. 34/2026/TT-BXD for non-structural maintenance works.
- Calibrate similar-contract requirements around comparable interior repairs rather than high-grade new hospital construction.
- Specify dust barriers, segregated haulage routes, and medical-gas or electrical isolation protocols in Chapter V.
- Define phased room-by-room site handover schedules inside draft contract execution terms.
Legal Basis & Regulatory Scope
Law on Procurement No. 22/2023/QH15 as amended by Laws No. 57/2024/QH15, 90/2025/QH15, 116/2025/QH15, 133/2025/QH15, and 142/2025/QH15 (Clause 3, Article 44); Construction Law No. 135/2025/QH15; Ministry of Construction Circular No. 34/2026/TT-BXD dated 25/06/2026 (Point b, Clause 4, Article 2; Clause 5, Article 3); Government Decree No. 214/2025/ND-CP dated 04/08/2025 (Clause 1, Article 29); Ministry of Finance Circular No. 79/2025/TT-BTC dated 04/08/2025 (Clause 5, Article 26).