Determining Building Grades for Commune-Level Government Headquarters and Non-Structural Maintenance Under Circular 34/2026/TT-BXD

Determining Building Grades for Commune-Level Government Headquarters and Non-Structural Maintenance Under Circular 34/2026/TT-BXD
Clarifying Item 1.1.7 of Table 1.1 Annex I grading commune-level government offices as Grade III with no Grade IV, and the Clause 5 Article 3 maintenance exemption under Circular 34/2026/TT-BXD.

Key Takeaways

  • Governing Scope: Construction Law No. 135/2025/QH15; Ministry of Construction Circular No. 34/2026/TT-BXD dated 25/06/2026, effective 01/07/2026 (Clauses 1, 2, and Point b Clause 4, .
  • Key Benchmark: Applying Clauses 1 and 2, Article 2 of Circular No.
  • Execution Control: Apply Clause 5 Article 3 to omit building-grade prerequisites on non-structural routine maintenance packages.

01Regulatory Context & Core Scope

When drafting works E-HSMT documents or evaluating contractor credentials for local administrative headquarters and public-building maintenance, procurement teams often hesitate between functional classification tables and structural height estimates. Effective from 01/07/2026, Ministry of Construction Circular No. 34/2026/TT-BXD dated 25/06/2026 provides unambiguous rules for both recurring scenarios.

02Core Regulatory Provisions & Conditions

For state agencies and political organizations, Item 1.1.7 of Table 1.1 in Annex I of Circular No. 34/2026/TT-BXD explicitly designates headquarters of commune-level Party Committees, People's Councils, People's Committees, and equivalent bodies as Grade III civil buildings, while leaving the Grade IV cell blank. Under Ministry of Construction grading rules, state administrative headquarters carry no Grade IV category.

Applying Clauses 1 and 2, Article 2 of Circular No. 34/2026/TT-BXD, evaluation panels must never speculate on story counts or building height under Annex II to downgrade a commune office to Grade IV merely because the submitted bid omits structural drawings or a construction permit. Once the reference contract and acceptance certificate identify a commune Party Committee, People's Council, or People's Committee headquarters, Item 1.1.7 of Table 1.1 directly establishes Grade III.

03Pricing Methodology & Cost Controls

Conversely, for renovation and upkeep packages, Point b, Clause 4, Article 2 of Circular No. 34/2026/TT-BXD states that repairs, renovations, upgrades, or extensions that do not alter grading criteria preserve the existing building grade. More importantly, Clause 5, Article 3 establishes a specific exemption: repairs, building-equipment replacements, routine servicing, and maintenance projects that do not alter load-bearing structures do not apply the building grades defined under the Circular.

Accordingly, E-HSMT drafters handling repainting, waterproofing, low-voltage electrical replacement, HVAC servicing, or minor non-structural building repairs after 01/07/2026 should define similar-contract criteria around comparable maintenance scope and contract value rather than imposing new-build Grade III construction credentials that unnecessarily exclude qualified maintenance contractors.

Checklist for Item 1.1.7 and Clause 5 Article 3 Under Circular 34/2026/TT-BXD

  • Reference Item 1.1.7 of Table 1.1 Annex I to confirm Grade III classification for new or majorly renovated commune-level administrative offices.
  • Refrain from guessing floor counts under Annex II to downgrade state headquarters without supporting structural drawings.
  • Verify in technical specifications whether maintenance, repairs, or equipment replacements affect load-bearing structures.
  • Apply Clause 5 Article 3 to omit building-grade prerequisites on non-structural routine maintenance packages.

Legal Basis & Regulatory Scope

Construction Law No. 135/2025/QH15; Ministry of Construction Circular No. 34/2026/TT-BXD dated 25/06/2026, effective 01/07/2026 (Clauses 1, 2, and Point b Clause 4, Article 2; Clause 5, Article 3; Item 1.1.7 of Table 1.1, Annex I); Ministry of Finance Circular No. 79/2025/TT-BTC dated 04/08/2025 (Clause 5, Article 26).