Tendering Specialized Medical Equipment Maintenance, Calibration, and Statutory Inspection Services at Public Hospitals

Tendering Specialized Medical Equipment Maintenance, Calibration, and Statutory Inspection Services at Public Hospitals
Guidance on separating non-consulting device maintenance from regulated inspection services under Articles 55 and 56 of Decree 98/2021/ND-CP when drafting Forms 5A or 5B under Circular 06/2024/TT-BKHDT.

Key Takeaways

  • Governing Scope: Bidding Law 22/2023/QH15 (Clause 3, Article 44); Decree 24/2024/ND-CP dated 27 February 2024 (Articles 16 and 24).
  • Key Benchmark: Under Article 56 of Decree 98/2021/ND-CP, entities performing statutory medical-device inspections must hold an official Certificate of Eligibility for Inspection Services.
  • Execution Control: Use Form 5A or 5B of Circular 06/2024/TT-BKHDT with explicit emergency onsite response time commitments.

01Regulatory Context & Core Scope

Public hospitals rely on two distinct technical streams to keep imaging systems, ventilators, electrosurgical units, and lab analyzers safe: preventive maintenance with wear-part replacement, and statutory safety inspection or metrology calibration. Under Bidding Law 22/2023/QH15, both outsourced streams qualify as non-consulting service packages drafted on Forms 5A or 5B of Circular 06/2024/TT-BKHDT.

02Qualification Benchmarks & Bidder Preferences

Procurement planning starts by screening hospital assets against mandatory inspection schedules under Article 55 of Decree 98/2021/ND-CP (as amended by Decree 07/2023/ND-CP), alongside radiation and metrology laws. Under Article 56 of Decree 98/2021/ND-CP, entities performing statutory medical-device inspections must hold an official Certificate of Eligibility for Inspection Services.

A common drafting mistake is bundling equipment maintenance and statutory safety inspection into one indivisible package lot. Because authorized maintenance providers rarely hold third-party inspection licenses under Article 56, combining both scopes under a single lot shrinks qualified competition and invites pre-bid challenges.

03Security Validity & Commitment Scope

Best practice separates statutory inspection and calibration into an independent lot or dedicated package so licensed inspection bodies can bid directly, while preventive maintenance packages define quarterly checkups, internal adjustments, spare-parts allowances, and guaranteed onsite response times. Budget estimates prepared under Article 16 of Decree 24/2024/ND-CP should separate recurring service labor from unit rates for as-needed spare parts.

Technical clauses for high-end modalities such as MRI or CT scanners may require manufacturer-trained service engineers, provided terms stay neutral and avoid naming a sole authorized agent in violation of Clause 3, Article 44 of Bidding Law 22/2023/QH15. Signed quarterly service logs and official calibration or inspection certificates serve as mandatory payment acceptance records.

Medical Maintenance & Inspection E-HSMT Checklist

  • Separate mandatory statutory inspections under Articles 55 and 56 of Decree 98/2021/ND-CP from maintenance lots.
  • Verify active inspection-service eligibility certificates and qualified inspector credentials in eligibility checks.
  • Separate fixed preventive maintenance fees from unit price schedules for replacement parts in budget estimates.
  • Use Form 5A or 5B of Circular 06/2024/TT-BKHDT with explicit emergency onsite response time commitments.

Legal Basis & Regulatory Scope

Bidding Law 22/2023/QH15 (Clause 3, Article 44); Decree 24/2024/ND-CP dated 27 February 2024 (Articles 16 and 24); Circular 06/2024/TT-BKHDT (Clause 5, Article 4; Forms 5A and 5B); Decree 98/2021/ND-CP dated 8 November 2021 (Articles 55 and 56, amended by Decree 07/2023/ND-CP).