Key Takeaways
- Governing Scope: Clause 3, Article 44 of Bidding Law 22/2023/QH15; Decree 24/2024/ND-CP.
- Key Benchmark: On e-GP, managed cloud hosting and network leasing typically use non-consulting service E-HSMT templates such as Form 5A under Article 4 of Circular 22/2024/TT-BKHDT.
- Execution Control: Mandate structured data portability at contract expiry and audit independent uptime logs before periodic payments.
01Regulatory Context & Core Scope
Rather than purchasing costly on-premise server hardware that quickly depreciates, public agencies increasingly tender for cloud infrastructure, dedicated transmission lines, and managed IT operations. Because these services are billed monthly or quarterly, the E-HSMT must translate system uptime and cybersecurity mandates into measurable acceptance metrics upfront.
02Security Validity & Commitment Scope
Under Decree 73/2019/ND-CP as amended by Decree 82/2024/ND-CP, IT service leases may span one to eight years to guarantee platform continuity, unless a shorter duration is expressly authorized. On e-GP, managed cloud hosting and network leasing typically use non-consulting service E-HSMT templates such as Form 5A under Article 4 of Circular 22/2024/TT-BKHDT.
For critical systems handling citizen records or national sector databases, the E-HSMT must enforce graded information-security protections classified from Level 1 to Level 5 under Decree 85/2016/ND-CP. Prospective cloud providers must demonstrate domestic data-center residency where legally required, geo-redundant backups, web-application firewalls, DDoS mitigation, and audit-compliant log retention.
03Core Regulatory Provisions & Conditions
Technical schedules and draft contracts should quantify Service Level Agreements explicitly, defining minimum uptime percentages, committed domestic and international bandwidth, maximum incident-response times, and automated monthly fee-deduction formulas for SLA breaches. Framing performance around open workload benchmarks satisfies Clause 3, Article 44 of Bidding Law 22/2023/QH15 without locking specs to proprietary hypervisors or hardware brands.
During periodic settlement under Chapter VIII of Decree 24/2024/ND-CP, the owner IT team should corroborate billing statements against independent uptime logs and resource utilization reports. Crucially, the contract must mandate structured data, virtual-machine image, and configuration exit-assistance at expiry to eliminate vendor lock-in.
Checklist for Cloud Infrastructure Lease E-HSMT and SLA Acceptance
- Set a 1-to-8-year lease term aligned with budget approvals under Decree 82/2024/ND-CP and apply non-consulting E-HSMT forms.
- Specify information-security grading under Decree 85/2016/ND-CP and domestic hosting mandates where regulated.
- Quantify SLA uptime ratios, incident-response windows, and automatic periodic payment deductions.
- Mandate structured data portability at contract expiry and audit independent uptime logs before periodic payments.
Legal Basis & Regulatory Scope
Clause 3, Article 44 of Bidding Law 22/2023/QH15; Decree 24/2024/ND-CP; Decree 73/2019/ND-CP (amended by Decree 82/2024/ND-CP); Decree 85/2016/ND-CP; Article 4 of Circular 22/2024/TT-BKHDT.