Key Takeaways
- Governing Scope: Bidding Law 22/2023/QH15 (Clause 3 Article 44); Decree 214/2025/ND-CP (Articles 29 and 30).
- Key Benchmark: Use Circular 79/2025/TT-BTC Form 4A or 4B and evaluate prior contracts by equipment type and commissioning scope.
- Execution Control: Verify subcontracting percentage caps and unified prime-contractor warranty obligations across hardware and installation.
01Regulatory Context & Core Scope
Procurement packages for laboratory analyzers, water treatment skids, medical imaging units, or enterprise server racks classify as goods tenders even though installation, commissioning, operator training, and technical transfer carry substantial technical risk. Under Forms 4A and 4B of Circular 79/2025/TT-BTC, capability evaluation must match goods-with-related-services rules rather than misapplying pure civil-works mandates.
02Qualification Benchmarks & Bidder Preferences
For prior similar contracts, E-HSMT criteria should specify supply contracts covering comparable equipment types and functional capacity, adding installation and commissioning scope only where site integration is technically significant. Evaluation panels must not demand construction corporate capacity certificates unless physical structural modifications independently trigger construction licensing law.
For installation and technical-transfer personnel, Circular 79/2025/TT-BTC allows targeted key-staff criteria covering complex related services (such as commissioning engineers or factory-trained application specialists) provided thresholds remain proportional and comply with Clause 3, Article 44 of the Bidding Law. Evaluators verify academic degrees, training credentials, and employment or mobilization commitments.
03Pricing Methodology & Cost Controls
During e-GP technical and price evaluation, bidders normally complete summary webform parameters while attaching detailed installation method statements, site readiness schedules, and training syllabi as PDF files. Evaluators must verify alignment between delivery dates and on-site testing timelines and confirm that installation consumables, initial calibration, and operator training costs are fully priced inside the webform bid schedule.
Where a bidder delegates physical installation to a subcontractor, the panel checks that subcontracted value stays within the E-BDL ceiling and that the prime vendor retains undivided warranty and integrated acceptance liability.
Goods + Installation & Tech-Transfer Evaluation Checklist
- Use Circular 79/2025/TT-BTC Form 4A or 4B and evaluate prior contracts by equipment type and commissioning scope.
- Avoid imposing civil-works corporate licenses on goods tenders involving standard equipment installation.
- Review attached PDF installation method statements, integrated commissioning procedures, and operator training schedules.
- Confirm installation accessories, initial calibration, and training fees are priced inside the e-GP webform price table.
- Verify subcontracting percentage caps and unified prime-contractor warranty obligations across hardware and installation.
Legal Basis & Regulatory Scope
Bidding Law 22/2023/QH15 (Clause 3 Article 44); Decree 214/2025/ND-CP (Articles 29 and 30); Circular 79/2025/TT-BTC (Clause 4 Article 4, Forms 4A and 4B).