Bid Evaluation & Award

The Three E-HSMT Publication Cutoffs (Pre-9 September, 9 September to 20 November, and From 21 November 2026) to Avoid Misjudging Bid Security

The Three E-HSMT Publication Cutoffs (Pre-9 September, 9 September to 20 November, and From 21 November 2026) to Avoid Misjudging Bid Security
How evaluation panels match Bid Security Forms 04A and 04B to the three e-GP publication cutoffs before 9 September, 9 September to 20 November, and from 21 November 2026 under Circular 168/2026/TT-BTC.

Key Takeaways

  • Governing Scope: Articles 20, 26, and Clause 33b of Article 140 of Decree 214/2025/ND-CP (amended by Decree 349/2026/ND-CP); Circular 79/2025/TT-BTC.
  • Key Benchmark: Check the exact E-TBMT publication timestamp and issued E-HSMT on e-GP to lock the governing version cutoff.
  • Execution Control: Use Clause 33b, Article 140 of Decree 214/2025/ND-CP to request validity restoration if evaluation extends past bid validity.

01Regulatory Context & Core Scope

During late 2026, standard bid security templates in Chapter IV of e-GP tender documents under Circular 79/2025/TT-BTC underwent two consecutive amendments via Circular 134/2026/TT-BTC and Circular 168/2026/TT-BTC. If an evaluation panel compares a submitted bank guarantee against whichever template happens to be stored locally without checking the official E-TBMT publication timestamp on e-GP, it risks either wrongfully disqualifying valid bids or overlooking missing mandatory undertakings.

02Effective Dates & Transitional Scope

The first cutoff covers E-HSMT packages published before 9 September 2026. Under transitional Clause 1, Article 7 of Circular 134/2026/TT-BTC and Point a, Clause 2, Article 27 of Decree 349/2026/ND-CP, those tenders remain governed by the original Circular 79/2025/TT-BTC text containing 6 clauses for single bidders (Form 04A) and 7 clauses for joint ventures (Form 04B), without any contract negotiation default clause.

The second cutoff covers E-HSMT packages published from 9 September 2026 through 20 November 2026. Throughout this window, Clause 3, Article 6 of Circular 134/2026/TT-BTC applied uniformly across Models 3A through 12B, requiring 7 clauses in Form 04A and 8 clauses in Form 04B, specifically including Clause 5 covering refusal to attend or sign contract negotiation minutes within 5 working days.

03Security Validity & Commitment Scope

The third cutoff governs E-HSMT packages published on e-GP from 21 November 2026 onward under Clause 5, Article 7 of Circular 168/2026/TT-BTC, which took legal effect on 14 November 2026. Starting 21 November 2026, bid security splits by template code: Annex I applies to single-envelope packages using Models 3A, 4A, 5A, 11A, and 12A (6 standalone and 7 joint-venture clauses without negotiation), whereas Annex II governs two-envelope and hybrid packages using Models 3B, 4B, 5B, 7A through 10B, 11B, and 12B (7 standalone and 8 joint-venture clauses retaining Clause 5 on contract negotiation).

During bid evaluation, panels must always anchor checks in the actual E-HSMT published on e-GP, verify bidder reputation status under Article 20 of Decree 214/2025/ND-CP (requiring triple security for 2 years where listed), and avoid falsely rejecting compliant 6-clause or 7-clause Annex I bonds. Where evaluation delays cause E-HSDT and security validity to lapse, Project Owners apply Clause 33b, Article 140 of Decree 214/2025/ND-CP as added by Article 16 of Decree 349/2026/ND-CP to invite validity restoration.

Three E-HSMT Posting Milestones for Bid Security Checking (2026)

Posting WindowGoverning RuleRequired Clauses (04A & 04B)
Before 09/09/2026Original Circular 79/2025/TT-BTC06 clauses (single) and 07 clauses (joint venture)
09/09/2026 to 20/11/2026Clause 3 Art. 6 Circular 134/2026/TT-BTC07 clauses (single) and 08 clauses (JV) including negotiation
From 21/11/2026 onwardClause 5 Art. 7 Circular 168/2026/TT-BTCAppendix I (06 or 07 clauses) or Appendix II (07 or 08 clauses)

Step-by-Step Cutoff Verification Before Scoring Bid Security

  • Check the exact E-TBMT publication timestamp and issued E-HSMT on e-GP to lock the governing version cutoff.
  • Identify whether the E-HSMT model falls under Annex I or Annex II for tenders published from 21 November 2026 onward.
  • Cross-check the required security amount against e-GP notice fields and bidder reputation flags under Article 20 of Decree 214/2025/ND-CP.
  • Do not disqualify 6-clause single or 7-clause joint-venture guarantees submitted for Annex I tenders under Circular 168/2026/TT-BTC.
  • Use Clause 33b, Article 140 of Decree 214/2025/ND-CP to request validity restoration if evaluation extends past bid validity.

Legal Basis & Regulatory Scope

Articles 20, 26, and Clause 33b of Article 140 of Decree 214/2025/ND-CP (amended by Decree 349/2026/ND-CP); Circular 79/2025/TT-BTC; Clause 3 of Article 6 and Clause 1 of Article 7 of Circular 134/2026/TT-BTC; Clause 5 of Article 7 and Annexes I and II of Circular 168/2026/TT-BTC.

Filed under: Bid Evaluation & Award #Bid Security #Circular 168/2026 #Circular 134/2026 #Circular 79/2025
Practical Follow-up: For package-specific inquiries, email info@vntender.com or call 0967 398 664.