Key Takeaways
- Governing Scope: Clause 3, Article 26 of Decree 214/2025/ND-CP; Circular 79/2025/TT-BTC.
- Key Benchmark: Footnote (2) of Form 04B continues to allow four compliant naming structures depending on whether a lead partner issues the guarantee or members submit separate securities.
- Execution Control: Confirm issuance occurs after E-HSMT publication and includes no unauthorized conditions restricting Project Owner claims.
01Regulatory Context & Core Scope
Circular 168/2026/TT-BTC entered into force on 14 November 2026, and the national e-GP portal implements the revised E-HSMT templates for tenders published from 21 November 2026 onward. Instead of applying one uniform guarantee wording as introduced in September 2026, Clause 5, Article 7 of Circular 168/2026/TT-BTC divides Form 04A (single bidder) and Form 04B (joint venture) of Circular 79/2025/TT-BTC into Annex I and Annex II based on whether contract negotiation applies.
02Pricing Methodology & Cost Controls
Under Point a, Clause 5, Article 7 of Circular 168/2026/TT-BTC, Annex I covers five single-envelope model codes: 3A (works), 4A (goods), 5A (non-consulting services), 11A (medical device placement), and 12A (standard online quotation for goods). Annex I restores 6 default clauses in Form 04A and 7 clauses in Form 04B, removing the contract negotiation default clause because ordinary domestic single-envelope tenders do not undergo formal negotiation.
By contrast, Point b, Clause 5, Article 7 applies Annex II across 13 model codes covering two-envelope procedures, hybrid packages, and online quotation for non-consulting services: Models 3B, 4B, 5B, 7A, 7B (EP), 8A, 8B (EC), 9A, 9B (PC), 10A, 10B (EPC), 11B, and 12B. Annex II preserves 7 clauses in Form 04A and 8 clauses in Form 04B, mandating Clause 5 on failure or refusal to conduct contract negotiation within 5 working days of invitation or to sign negotiation minutes.
03Security Validity & Commitment Scope
Across both Annex I and Annex II, Form 04B for joint ventures retains the joint-liability forfeiture clause at the end (Clause 7 in Annex I and Clause 8 in Annex II), confirming that if any member commits an infraction under Clause 18.5 E-CDNT, the bid security of all joint-venture members is forfeited. Footnote (2) of Form 04B continues to allow four compliant naming structures depending on whether a lead partner issues the guarantee or members submit separate securities.
When drafting or auditing tender documents scheduled for publication from 21 November 2026, practitioners should verify eight mandatory points on every guarantee: exact beneficiary details per Clause 1.1 E-BDL, accurate contractor or joint-venture naming, package title and E-TBMT reference, sufficient secured value, validity days under Clause 18.2 E-BDL counted from the bid closing date, issuance dated after E-HSMT release, authorized signature, and complete alignment with the applicable Annex clause list.
Comparison: Appendix I vs Appendix II under Circular 168/2026/TT-BTC
| Criteria | Appendix I | Appendix II |
|---|---|---|
| Applicable Templates | 05 templates: 3A, 4A, 5A, 11A, 12A | 13 templates: 3B, 4B, 5B, 7A to 10B, 11B, 12B |
| Form 04A (Single) | 06 commitment clauses | 07 clauses (includes Clause 5 five-working-day negotiation) |
| Form 04B (Joint Venture) | 07 clauses (Clause 7 joint liability) | 08 clauses (Clause 8 joint liability) |
Quick Annex I vs Annex II Audit Checklist Under Circular 168/2026
- Verify whether the E-HSMT template maps to Annex I (3A, 4A, 5A, 11A, 12A) or Annex II (3B, 4B, 5B, 7A to 10B, 11B, 12B).
- Confirm Form 04A includes 6 clauses under Annex I or 7 clauses including Clause 5 negotiation under Annex II from 21 November 2026.
- Check Form 04B includes the joint-venture forfeiture clause at Clause 7 (Annex I) or Clause 8 (Annex II) and uses an approved naming format.
- Confirm issuance occurs after E-HSMT publication and includes no unauthorized conditions restricting Project Owner claims.
Legal Basis & Regulatory Scope
Clause 3, Article 26 of Decree 214/2025/ND-CP; Circular 79/2025/TT-BTC; Clause 5, Article 7, Annex I, and Annex II of Circular 168/2026/TT-BTC dated 14 November 2026 of the Ministry of Finance.