Bid Evaluation & Award

Validating Electronic Bid Securities and Bank Guarantees Under Forms 04A and 04B of Circular 79/2025/TT-BTC

Validating Electronic Bid Securities and Bank Guarantees Under Forms 04A and 04B of Circular 79/2025/TT-BTC
Detailed audit guide checking eight mandatory validity rules for electronic bid securities and bank guarantees under Article 27, Forms 04A/04B of Circular 79/2025/TT-BTC, and Article 20 of Decree 214/2025/ND-CP.

Key Takeaways

  • Governing Scope: Bidding Law 22/2023/QH15 (Articles 14, 16, and 68); Decree 214/2025/ND-CP (Article 20).
  • Key Benchmark: On e-GP, Article 27 of Circular 79/2025/TT-BTC regulates electronic bid guarantees issued by licensed banks or non-life insurers and stored directly on the platform.
  • Execution Control: Validate digital signatures on electronic guarantees or authorized wet signatures and issue dates postdating E-HSMT publication.

01Regulatory Context & Core Scope

Bid security compliance represents an unforgiving threshold during E-HSDT eligibility checks, because shortfalls in amount, validity duration, or mandatory payment clauses cannot be cured through post-closing clarifications. Under Article 14 of Bidding Law 22/2023/QH15, standard bid security rates run from 1% to 1.5% for works and mixed packages up to VND 20 billion or goods and non-consulting packages up to VND 10 billion, and from 1.5% to 3% for larger tenders.

02Security Validity & Commitment Scope

On e-GP, Article 27 of Circular 79/2025/TT-BTC regulates electronic bid guarantees issued by licensed banks or non-life insurers and stored directly on the platform. Crucially for joint ventures, every member must adopt the same submission format (either all submitting electronic guarantees or all uploading scanned signed paper guarantees) rather than mixing electronic and paper instruments within one bid.

When auditing Form 04A (single bidder, six forfeiture clauses) or Form 04B (joint venture, seven clauses including Clause 7 joint liability) under Circular 79/2025/TT-BTC, evaluators must verify exact beneficiary naming per E-BDL 1.1, package title, E-TBMT reference, issue date not predating E-HSMT publication, numeric and written amounts, and full validity starting from the bid-closing date.

03Procedural Sequence & e-GP Execution

Evaluators must also check e-GP contractor reputation records under Article 20 of Decree 214/2025/ND-CP. Any bidder listed for prior tender non-compliance (such as refusing document verification, negotiation, or contract execution) must submit a triple (3x) bid security amount for non-consulting tenders over a two-year sanction window.

For smaller packages whose calculated bid security falls below VND 50 million under Circular 79/2025/TT-BTC template notes, a signed commitment inside the bid submission form suffices without a bank guarantee. Whenever bid evaluation or petition reviews require extending E-HSDT validity, bidders must extend their electronic or bank bid security accordingly.

8-Gate Bid Security Validity Audit

  • Match beneficiary name and address verbatim against E-BDL 1.1 and package code against the E-TBMT notice.
  • Confirm uniform format (all electronic or all paper) across every joint-venture partner under Article 27 of Circular 79/2025/TT-BTC.
  • Check e-GP reputation status to enforce triple (3x) security obligations under Article 20 of Decree 214/2025/ND-CP where applicable.
  • Verify all 6 commitment clauses (Form 04A) or 7 clauses with joint liability (Form 04B) free of adverse conditions.
  • Validate digital signatures on electronic guarantees or authorized wet signatures and issue dates postdating E-HSMT publication.

Legal Basis & Regulatory Scope

Bidding Law 22/2023/QH15 (Articles 14, 16, and 68); Decree 214/2025/ND-CP (Article 20); Circular 79/2025/TT-BTC (Article 27, Forms 04A and 04B).

Filed under: Bid Evaluation & Award #Bid Security #Electronic Guarantee #Forms 04A & 04B #Circular 79/2025
Practical Follow-up: For package-specific inquiries, email info@vntender.com or call 0967 398 664.