Key Takeaways
- Governing Scope: Construction Law No. 135/2025/QH15; Ministry of Construction Circular No. 34/2026/TT-BXD dated 25/06/2026, effective 01/07/2026 (Clauses 1, 2, and 3, Article 2.
- Key Benchmark: For an independent structure, Clause 2, Article 2 establishes that its controlling grade is the highest grade obtained across Annex I and Annex II.
- Execution Control: Never aggregate floor areas or structural metrics across separate standalone buildings to inflate the grade.
01Regulatory Context & Core Scope
Across industrial parks, multi-block hospitals, and wastewater treatment plants, works packages often combine main facilities with guardhouses, utility stations, and interconnected piping networks. Misapplying the rules for standalone structures versus multi-structure complexes under Article 2 of Circular No. 34/2026/TT-BXD frequently misaligns E-HSMT similar-contract grades against approved design documents.
02Qualification Benchmarks & Bidder Preferences
Under Clause 1, Article 2 of Circular No. 34/2026/TT-BXD, building grades operate across two parallel frameworks: importance and capacity scale under Annex I (applying to standalone structures, complexes, and process lines), and structural scale under Annex II (applying to individual standalone structures). Cross-checking both annexes captures facilities with modest throughput yet demanding structural heights or roof spans.
For an independent structure, Clause 2, Article 2 establishes that its controlling grade is the highest grade obtained across Annex I and Annex II. Where a standalone structure is absent from Annex I, its grade follows Annex II alone, and vice versa if omitted from Annex II. Taking the higher outcome protects engineering safety and contractor capability requirements for the structure's most demanding attribute.
03Core Regulatory Provisions & Conditions
For a building complex or multi-item process line, Clause 3, Article 2 sets a clear two-branch test. Under Point a, if the complex or process line appears directly in Annex I (such as rated wastewater treatment throughput or sports complexes), Annex I determines the grade directly. Under Point b, if unaddressed in Annex I, the complex takes the grade of its highest-graded main constituent structure determined under Clause 2.
When drafting multi-building E-HSMTs, consultants should cleanly separate main buildings from ancillary elements such as guardhouses, perimeter fences, or bicycle sheds, avoiding both using ancillary low grades for the whole tender and artificially summing separate small footprints into a single structural tier.
Single Structure vs Complex Plant Grading (Article 2 Circular 34/2026/TT-BXD)
| Asset Scope | Reference Appendix | Controlling Grade Rule |
|---|---|---|
| Standalone Structure | Appendix I (capacity) & Appendix II (structural) | Take the higher grade between Appendix I and Appendix II |
| Named Complex or Process Line | Point a Clause 3 Art. 2 (Appendix I) | Determine grade directly under Appendix I classification |
| Unlisted Multi-Building Complex | Point b Clause 3 Art. 2 | Adopt highest grade among the primary structures in the complex |
Steps to Apply Annexes I and II of Circular 34/2026/TT-BXD
- Determine whether the package comprises standalone structures or an integrated building complex or process line.
- For standalone buildings, check both Annex I and Annex II under Clause 2, Article 2 and adopt the highest grade.
- For complexes or process lines, verify direct Annex I coverage before defaulting to the highest-graded main structure under Point b, Clause 3.
- Never aggregate floor areas or structural metrics across separate standalone buildings to inflate the grade.
Legal Basis & Regulatory Scope
Construction Law No. 135/2025/QH15; Ministry of Construction Circular No. 34/2026/TT-BXD dated 25/06/2026, effective 01/07/2026 (Clauses 1, 2, and 3, Article 2; Annex I and Annex II); Ministry of Finance Circular No. 79/2025/TT-BTC dated 04/08/2025.