Key Takeaways
- Governing Scope: Bidding Law 22/2023/QH15; Decree 214/2025/ND-CP dated 4 August 2025.
- Key Benchmark: Require exact page and filename citations for every extracted claim or numeric metric.
- Execution Control: Flag missing or illegible evidence as gaps instead of extrapolating unconfirmed figures.
01Regulatory Context & Core Scope
Reviewing multi-hundred-page scanned bid submissions containing contracts, tax invoices, financial statements, and staff licenses carries high risk whenever stamps overlap numbers or scans are skewed.
02Core Regulatory Provisions & Conditions
Rather than letting AI issue autonomous conclusions, disciplined engineering practice separates indexing from verification: build a full page-numbered index first, extract structured fields, and have qualified engineers inspect original page renders for critical figures such as contract sums, dates, and license grades.
This human-in-the-loop discipline accelerates dossier navigation while guaranteeing auditability back to exact source pages.
Source-Verification Safeguards
- Require exact page and filename citations for every extracted claim or numeric metric.
- Visually verify decision numbers, tax IDs, contract values, and official signatures on source scans.
- Flag missing or illegible evidence as gaps instead of extrapolating unconfirmed figures.
Legal Basis & Regulatory Scope
Bidding Law 22/2023/QH15; Decree 214/2025/ND-CP dated 4 August 2025; Circular 79/2025/TT-BTC dated 4 August 2025.