Key Takeaways
- Governing Scope: Article 14 of Bidding Law 22/2023/QH15; Clause 1 of Article 20, Clause 2 of Article 26, Clause 1 of Article 29, and Clause 4 of Article 80 of Decree 214/2025/ND-CP (.
- Key Benchmark: Pursuant to Clause 2, Article 26 and Clause 1, Article 29 of Decree 214/2025/ND-CP, competition-restricting E-HSMT conditions cannot serve as lawful grounds for disqualifying an E-HSDT.
- Execution Control: Collect and verify the original paper guarantee within 5 working days during post-evaluation document verification.
01Regulatory Context & Core Scope
After 9 September 2026, following Decree 349/2026/ND-CP raising the small-purchase threshold in Clause 4, Article 80 of Decree 214/2025/ND-CP to 100,000,000 VND and Circular 134/2026/TT-BTC updating Form 2A accordingly, some Project Owners inserted E-BDL wording attempting to mandate electronic bid guarantees exclusively for values above 100,000,000 VND. Evaluators then face a recurring question when bidders attach a valid scanned paper bank guarantee instead of an e-guarantee.
02Security Validity & Commitment Scope
Under Point a, Clause 1, Article 27 of Circular 79/2025/TT-BTC and Sections 18.1 and 18.7 E-CDNT, exemption at bid submission applies only where required bid security is below 50,000,000 VND. For any bid security of 50,000,000 VND or higher (including amounts above 100,000,000 VND), bidders retain the lawful right to submit either an e-guarantee stored on e-GP or a scan of a valid original paper bank guarantee or surety insurance certificate.
Unilaterally adding an E-BDL restriction that forbids scanned paper guarantees departs from Ministry of Finance templates and unfairly excludes bidders banking with institutions not yet integrated into e-GP. Pursuant to Clause 2, Article 26 and Clause 1, Article 29 of Decree 214/2025/ND-CP, competition-restricting E-HSMT conditions cannot serve as lawful grounds for disqualifying an E-HSDT.
03Qualification Benchmarks & Bidder Preferences
Rather than rejecting the bid over paper format, the evaluation panel must audit the scanned guarantee substantively against Section 18.3 E-CDNT and Form 04A (7 clauses) or Form 04B (8 clauses) under Clause 3, Article 6 of Circular 134/2026/TT-BTC for packages published from 9 September 2026. The scan passes only if all pages are legible, beneficiary naming, value, validity, post-issuance date, authorized bank signature, and commitment clauses are intact, and all joint venture members use the paper format uniformly.
When inviting the top bidder for document verification, the Project Owner enforces Sections 18.5 and 18.6 E-CDNT by requiring submission of the original paper guarantee within 5 working days. Failure to deliver the matching original triggers forfeiture and credibility-list sanctions under Clause 1, Article 20 of Decree 214/2025/ND-CP.
Checklist for Evaluating Scanned Paper Guarantees Against e-Guarantee Clauses
- Do not disqualify a compliant scanned paper guarantee solely because an E-BDL clause demanded e-guarantee exclusively, per Article 27 of Circular 79/2025/TT-BTC and Article 29 of Decree 214/2025/ND-CP.
- Verify all 7 commitment clauses (Form 04A) or 8 clauses (Form 04B) under Clause 3, Article 6 of Circular 134/2026/TT-BTC for packages published from 9 September 2026.
- Check format uniformity across joint venture members (all paper scan or all electronic guarantee).
- Collect and verify the original paper guarantee within 5 working days during post-evaluation document verification.
Legal Basis & Regulatory Scope
Article 14 of Bidding Law 22/2023/QH15; Clause 1 of Article 20, Clause 2 of Article 26, Clause 1 of Article 29, and Clause 4 of Article 80 of Decree 214/2025/ND-CP (as amended by Clause 4, Article 6 of Decree 349/2026/ND-CP); Point a, Clause 1, Article 27 and Section 18 E-CDNT of Circular 79/2025/TT-BTC; and Clause 3, Article 6 of Circular 134/2026/TT-BTC.