Bid Evaluation & Award

Standardizing Bid Evaluation Reports Under Form 02A of Circular 134/2026/TT-BTC: General Information Layout and Award Summary Tables

Standardizing Bid Evaluation Reports Under Form 02A of Circular 134/2026/TT-BTC: General Information Layout and Award Summary Tables
Step-by-step standard for completing General Information fields, reconciling Table 6 award summaries, and formatting Word layouts under Form 02A of Circular 134/2026/TT-BTC.

Key Takeaways

  • Governing Scope: Articles 32 and 33 of Decree 214/2025/ND-CP; Article 30 of Circular 79/2025/TT-BTC.
  • Key Benchmark: Verify every Section I.1 metadata line matches published KHLCNT, E-TBMT, and original approval decisions.
  • Execution Control: Lock table rows against page splits, enable repeating headers, and inspect rendered PDF pages before signing.

01Regulatory Context & Core Scope

Under Clause 2, Article 2 of Circular 134/2026/TT-BTC, Form 2A (commonly cited as Form 02A) governs single-envelope evaluation reports and may be adapted by Project Owners for direct-appointment proposals (HSDX), expressions of interest, or pre-qualification evaluations. When standardizing evaluation reports built on Form 02A alongside e-GP Form 14A of Circular 79/2025/TT-BTC, panels should tighten quality control over two error-prone sections: the General Information block and the consolidated award summary table.

02Pricing Methodology & Cost Controls

Section I.1 (Project, Package, and Legal Basis Overview) should present cleanly separated paragraphs matching official e-GP records and signed approvals: Project Owner, project or budget title, package name, KHLCNT code and posting timestamp, E-TBMT or notice reference and timestamp, exact package budget to the dong, funding source, preparation and selection schedules, method and procedure, contract type, duration, additional-purchase options, and full citations of KHLCNT, E-HSMT or HSYC approvals and addenda.

Sections II.1 through II.6 aggregate line-by-line assessments upward from Forms 1A and 1B (completeness) and Form 2 (validity) into Table 2, Form 3 (qualifications) into Table 3, Form 4A or 4B (technical compliance) into Table 4, and financial adjustments into Table 5. Every interim table feeds directly into Table 6 (Consolidated Evaluation Summary), tracking seven decision lines per bidder from validity and technical pass status through corrected, adjusted, discounted, and preference-adjusted prices to final ranking.

03Core Regulatory Provisions & Conditions

A strict verbatim extraction rule applies to every attached scoring sheet: the E-HSMT or HSYC requirement column must preserve 100% of the issued text and footnotes without paraphrasing or dropping exceptions. Conversely, unused template modules—such as point-scoring Form 4B in a pass-fail tender or evaluated-price worksheets in a lowest-price award—must be removed completely rather than left blank.

For administrative formatting under Decree 30/2020/ND-CP, Section I opens with a borderless 2x2 header table using the statutory BC report symbol, deletes italic template guidance notes, strips stray Word auto-numbering properties that duplicate heading numbers, enables repeating multi-tier table headers, and locks row splitting across pages before exporting PDF files for independent appraisal and e-GP publication.

Five-Step Pre-Submission Audit for Form 02A Reports

  • Verify every Section I.1 metadata line matches published KHLCNT, E-TBMT, and original approval decisions.
  • Cross-check verbatim criteria in Forms 2, 3, and 4A or 4B against issued Chapter III requirements.
  • Reconcile arithmetic across Table 5 (financial adjustments), Table 6 (consolidated summary), and Section III award recommendations.
  • Strip italic circular guidance notes, unused alternative forms, and duplicate auto-numbering attributes from the Word file.
  • Lock table rows against page splits, enable repeating headers, and inspect rendered PDF pages before signing.

Legal Basis & Regulatory Scope

Articles 32 and 33 of Decree 214/2025/ND-CP; Article 30 of Circular 79/2025/TT-BTC; Point a, Clause 2, Article 2 and Form 2A of Circular 134/2026/TT-BTC; Decree 30/2020/ND-CP.

Filed under: Bid Evaluation & Award #Evaluation Report #Circular 134/2026 #E-HSDT #Circular 79/2025
Practical Follow-up: For package-specific inquiries, email info@vntender.com or call 0967 398 664.