Key Takeaways
- Governing Scope: Bidding Law 22/2023/QH15 dated 23 June 2023; Government Decree 24/2024/ND-CP dated 27 February 2024 (Articles 27 and 28).
- Key Benchmark: Inspect all uploaded attachment folders inside the opened E-HSDT to confirm scanned contracts and acceptance records were submitted on time.
- Execution Control: Verify technical similarity, completed contract values, and consortium work shares against authenticated original documents.
01Regulatory Context & Core Scope
Electronic bid preparation on e-GP requires bidders to populate structured webform fields while uploading scanned supporting files for similar-contract experience. Evaluation panels frequently encounter bids where full scanned contracts, BOQ schedules, VAT invoices, and acceptance minutes are uploaded, yet the summary webform rows were accidentally left blank, causing automated summaries to show zero experience.
02Validity Boundaries & Common Evaluation Pitfalls
In this situation, the Bid Evaluation Panel must not summarily disqualify the bidder for lacking experience or allege bid fraud. Leaving webform rows empty while enclosing authentic contract scans inside the timely submitted E-HSDT is a clerical formatting omission rather than a misrepresentation of underlying corporate qualifications.
Under Articles 27 and 28 of Decree 24/2024/ND-CP and Circular 01/2024/TT-BKHDT, the evaluation team reviews the complete E-HSDT package and issues an official e-GP clarification request. The inquiry directs the bidder to confirm exact contract values, similar-scope portions, and completion dates reflected in the uploaded PDF attachments.
03Procedural Sequence & e-GP Execution
Where the already-attached scanned dossier substantiates every technical scale and value threshold in the E-HSMT, the panel marks the criterion as compliant once the bidder confirms the figures in writing. If the attached contract fails to satisfy the E-HSMT threshold, the procuring entity requests clarification or supplementary contracts pre-existing before bid closing within at least 03 working days.
From a bidder risk perspective, leaving webform tables empty risks automated screening errors and prolongs evaluation through formal clarification rounds. Contractors should reconcile every webform row against its matching scanned contract and acceptance certificate prior to final e-GP submission.
Handling Omitted Webform Entries With Scanned Contracts
- Inspect all uploaded attachment folders inside the opened E-HSDT to confirm scanned contracts and acceptance records were submitted on time.
- Refrain from immediate rejection based solely on blank webform rows when valid supporting scans exist inside the dossier.
- Issue an e-GP clarification notice granting at least 03 working days for written confirmation of contract metrics.
- Verify technical similarity, completed contract values, and consortium work shares against authenticated original documents.
Legal Basis & Regulatory Scope
Bidding Law 22/2023/QH15 dated 23 June 2023; Government Decree 24/2024/ND-CP dated 27 February 2024 (Articles 27 and 28); Circular 01/2024/TT-BKHDT dated 15 February 2024.