Key Takeaways
- Governing Scope: Bidding Law 22/2023/QH15 (Article 59); Decree 214/2025/ND-CP (Article 38).
- Key Benchmark: E-HSMT scoring matrices commonly require at least 70% of maximum technical points overall plus minimum sub-thresholds across firm experience, methodology, and key personnel.
- Execution Control: Verify practicing construction certificates and labor contracts for proposed key leads prior to contract award.
01Regulatory Context & Core Scope
For geotechnical surveys, detailed engineering design, and construction supervision packages, consulting quality directly governs structural safety and downstream construction cost control. Applying lowest-price selection to complex engineering assignments exposes Project Owners to cut-rate bids followed by understaffed site oversight.
02Pricing Methodology & Cost Controls
Article 59 of Bidding Law 22/2023/QH15 defines four consulting evaluation methods, with quality-and-cost combined scoring designed for assignments balancing engineering rigor and fee competitiveness. Under Form 6A (one-stage two-envelope) prescribed in Clause 6, Article 4 of Circular 79/2025/TT-BTC, technical weightings span 70% to 80% and financial weightings span 20% to 30%, summing strictly to 100%.
Before opening financial envelopes, the evaluation panel must complete technical scoring and obtain formal approval of the technically responsive shortlist under Article 38 of Decree 214/2025/ND-CP. E-HSMT scoring matrices commonly require at least 70% of maximum technical points overall plus minimum sub-thresholds across firm experience, methodology, and key personnel. Bidders falling below minimum technical thresholds are disqualified before price opening.
03Procedural Sequence & e-GP Execution
Within technical scoring matrices for construction consulting, primary points belong to verified practicing licenses and past project roles of key leads, survey chiefs, lead discipline engineers, and chief site supervisors matched to project grade, alongside concrete QA/QC workflows or BIM coordination procedures where required. For eligible preferential bidders in international consulting tenders, Article 38 grants an additional 7.5% to the composite score.
During financial evaluation, price scores reflect bid values after arithmetic correction, deviation adjustment, and valid discounts. The consultant achieving the highest combined technical-and-cost score ranks first and advances to credential verification and contract negotiation, locking in the exact personnel scored in the proposal.
Controls for Quality-and-Cost Consulting Tenders
- Use Form 6A (one-stage two-envelope) under Clause 6, Article 4 of Circular 79/2025/TT-BTC, or Form 6B for EOI shortlisting.
- Calibrate technical weights within 70% to 80% and price weights within 20% to 30% based on engineering complexity.
- Set explicit minimum technical pass marks (typically at least 70% of max technical points) and mandatory sub-criteria floors.
- Secure formal approval of the technically qualified shortlist before decrypting financial envelopes on e-GP.
- Verify practicing construction certificates and labor contracts for proposed key leads prior to contract award.
Legal Basis & Regulatory Scope
Bidding Law 22/2023/QH15 (Article 59); Decree 214/2025/ND-CP (Article 38); Circular 79/2025/TT-BTC (Clause 6 Article 4, Forms 6A and 6B).