Key Takeaways
- Governing Scope: Bidding Law 22/2023/QH15; Decree 175/2024/ND-CP (replacing Decree 15/2021/ND-CP).
- Key Benchmark: Confirm the project's structural grade before setting practicing certificate grades, preventing upward grade inflation.
- Execution Control: Include contract substitution clauses requiring replacement inspectors to match or exceed original scored qualifications.
01Regulatory Context & Core Scope
Field quality control depends heavily on supervision consultants, yet supervision E-HSMT packages frequently stumble between inflating personnel requirements above actual building grades and writing vague criteria that let under-qualified inspectors onto the site. Drafted packages must align Circular 79/2025/TT-BTC Form 6A with updated construction licensing rules under Decree 175/2024/ND-CP, which replaced Decree 15/2021/ND-CP.
02Qualification Benchmarks & Bidder Preferences
Under Decree 175/2024/ND-CP, newly issued Vietnamese construction practicing certificates carry a 10-year validity term, while examination and licensing for Grades I, II, and III are decentralized to provincial People's Committees and Departments of Construction. Accordingly, E-HSMT criteria for the Chief Supervision Engineer and discipline inspectors (structural, roads, utilities, or MEP installation) must tie required certificate grades strictly to the package's statutory building grade.
Evaluators and drafters must uphold the non-inflation rule: personnel qualifications and prior project grade experience may only require the package's building grade or higher and never demanding Grade I licenses for Grade III or Grade IV works. Furthermore, because Decree 175/2024/ND-CP exempts non-load-bearing finishing works (such as plastering, tiling, painting, door fitting, and internal telecom cabling) from supervision license mandates, renovation E-HSMTs must avoid imposing unlawful certification barriers.
03Core Regulatory Provisions & Conditions
Within technical scoring matrices under Form 6A, allocate higher weight to the Chief Supervision Engineer (who signs stage completion records and coordinates site safety) while scoring structural and MEP discipline inspectors on matching academic majors, valid licenses as of bid closing, and verified prior roles.
In the Terms of Reference, stipulate binding site-presence schedules (full-time vs. hold-point attendance during concrete pours, pressure testing, and concealed-work inspections) and require any post-award personnel replacement to hold equal or superior credentials to the scored candidate.
Construction Supervision Personnel Criteria Checklist
- Confirm the project's structural grade before setting practicing certificate grades, preventing upward grade inflation.
- Respect Decree 175/2024/ND-CP license exemptions for non-load-bearing finishing and internal telecom scopes.
- Define exact degree disciplines, supervision scopes (civil works vs. equipment installation), and minimum experience years per role.
- Specify mandatory site-attendance intensity and transparent scoring allocations across Team Leader and discipline inspectors.
- Include contract substitution clauses requiring replacement inspectors to match or exceed original scored qualifications.
Legal Basis & Regulatory Scope
Bidding Law 22/2023/QH15; Decree 175/2024/ND-CP (replacing Decree 15/2021/ND-CP); Decree 214/2025/ND-CP; Circular 79/2025/TT-BTC (Form 6A); Circular 06/2021/TT-BXD (on building grade classification).