Verifying Power of Attorney for Branch Directors and Deputies Signing Bids, Joint Ventures, and Contracts

Verifying Power of Attorney for Branch Directors and Deputies Signing Bids, Joint Ventures, and Contracts
Guidance on auditing powers of attorney, joint-venture signatures, corporate seals, and the mandatory rule requiring parent-company e-GP accounts under Circular 22/2024/TT-BKHDT.

Key Takeaways

  • Governing Scope: Article 5 of Bidding Law 22/2023/QH15; Decree 24/2024/ND-CP.
  • Key Benchmark: Confirm the E-HSDT was submitted through the parent company e-GP account rather than a dependent branch account.
  • Execution Control: Collect the original wet-signed power of attorney during pre-contract document verification.

01Regulatory Context & Core Scope

In e-bidding practice, large contractors routinely authorize deputy directors or regional branch heads to sign bid letters, joint-venture agreements, and contract documents. Yet mistakes in drafting delegation scopes or submitting bids through a branch e-GP account frequently trigger eligibility disqualification during evaluation.

02Procedural Sequence & e-GP Execution

Under standard E-HSMT templates of Circular 22/2024/TT-BKHDT and Decree 24/2024/ND-CP, a legal representative may delegate authority in writing to a deputy, subordinate officer, branch director, or representative-office head to sign the bid submission letter, joint-venture agreement, clarification responses, and resulting contract. A scanned power of attorney must accompany the E-HSDT, with the signed original produced prior to contract execution.

A strict legal boundary prohibits sub-delegation while clarifying corporate seal usage. An authorized branch director or deputy cannot further delegate signing authority to department managers or staff engineers. Regarding seals, the authorized signatory may affix either the parent company seal or the branch seal where authorized by internal corporate governance rules.

03Core Regulatory Provisions & Conditions

The second critical trap lies in e-GP portal login credentials. Under Article 5 of Bidding Law 22/2023/QH15, a dependent-accounting branch lacks independent legal personality and cannot stand as an independent bidder; therefore, E-HSDT submission on e-GP must occur under the parent company account even when attached documents carry the authorized branch director signature.

In joint ventures, every consortium member must execute the joint-venture agreement through its legal representative or a properly authorized deputy or branch director supported by a separate parent-company power of attorney. Evaluation panels should verify authorization dates, enumerated powers, non-sub-delegation compliance, and the submitting e-GP entity account simultaneously.

Checklist for Power of Attorney and e-GP Account Eligibility

  • Confirm the E-HSDT was submitted through the parent company e-GP account rather than a dependent branch account.
  • Verify the power of attorney was executed by the statutory legal representative prior to bid and consortium signing.
  • Check that no unauthorized sub-delegation occurred on bid forms, clarifications, or joint-venture agreements.
  • Collect the original wet-signed power of attorney during pre-contract document verification.

Legal Basis & Regulatory Scope

Article 5 of Bidding Law 22/2023/QH15; Decree 24/2024/ND-CP; Circular 22/2024/TT-BKHDT (rules on bidder eligibility, delegation, and e-GP submission accounts).