Key Takeaways
- Governing Scope: Clause 18, Article 131 of Decree 24/2024/ND-CP; Articles 60 and 61 of Bidding Law 22/2023/QH15.
- Key Benchmark: Check certified women-owned SME status as tier-one tie-breaker.
- Execution Control: Verify valid three-month-plus employment contracts for disabled, ethnic-minority, or female staff across tiers four to six.
01Regulatory Context & Core Scope
When two or more bidders tie identically on lowest evaluated price or combined technical-and-financial score after arithmetic checks and deviation adjustments, an evaluation panel cannot resort to coin tosses or split the contract arbitrarily. Clause 18, Article 131 of Decree 24/2024/ND-CP establishes a strict sequential six-tier tie-breaker to determine the first-ranked bidder.
02Qualification Benchmarks & Bidder Preferences
First priority goes to women-owned small and medium-sized enterprises recognized under SME support legislation. If neither or multiple tied bidders qualify, second priority depends on the evaluation method: under lowest price, the panel selects the bidder with higher technical scoring or fewer marginally acceptable technical items; under evaluated-price or combined technical-and-price scoring, the panel selects the bidder with the lower corrected bid price after discounts.
If the tie persists after step two, third priority favors a bidder whose head office is legally registered in the province or locality where the package is executed. Panels must verify head-office locations from synced national enterprise registry data rather than branch or liaison-office addresses.
03Core Regulatory Provisions & Conditions
Should local head-office status remain tied, Clause 18 proceeds through three labor-policy tie-breakers: fourth priority goes to bidders employing at least 25% war invalids or persons with disabilities under valid contracts of three months or more at bid closing; fifth priority favors bidders employing at least 25% ethnic minority workers on equivalent terms; and sixth priority goes to the bidder with a higher percentage of female employees.
In evaluation reports prepared under Circular 23/2024/TT-BKHDT or e-GP workflows, panels must document each tier sequentially along with verified SME status, labor rosters, or registry extracts obtained via formal clarifications. Transparent tier-by-tier scoring shields award decisions against runner-up bidder petitions.
Six-Tier Tie-Breaking Verification Sequence
- Check certified women-owned SME status as tier-one tie-breaker.
- Compare technical scores (lowest-price packages) or corrected bid prices (evaluated-price or combined-score packages) at tier two.
- Verify head-office province on the enterprise registration certificate against package location at tier three.
- Verify valid three-month-plus employment contracts for disabled, ethnic-minority, or female staff across tiers four to six.
Legal Basis & Regulatory Scope
Clause 18, Article 131 of Decree 24/2024/ND-CP; Articles 60 and 61 of Bidding Law 22/2023/QH15; Circular 22/2024/TT-BKHDT; Circular 23/2024/TT-BKHDT.