Key Takeaways
- Governing Scope: Bidding Law 43/2013/QH13; Decree 63/2014/ND-CP (Articles 84 and 85).
- Key Benchmark: Never accept or open paper dossiers as substitutes for an E-HSDT not successfully uploaded to e-GP before closing.
- Execution Control: Document the formal refusal or unopened return of any unsolicited hardcopy binders delivered outside E-HSMT rules.
01Regulatory Context & Core Scope
As mandatory electronic tendering under Circular 08/2022/TT-BKHDT expands through 2023, procuring entities frequently encounter bidders delivering paper dossiers directly to office reception desks. Some contractors attempt paper submissions after encountering last-minute digital signature issues, while others ship boxes of catalogs or quality certificates outside e-GP to supplement online bids.
02Procedural Sequence & e-GP Execution
Under electronic procurement principles in Articles 84 and 85 of Decree 63/2014/ND-CP and Circular 08/2022/TT-BKHDT, the electronic E-HSDT successfully submitted on the National e-Procurement System is the sole legally valid basis for bid opening and evaluation. The platform locks automatically at the closing timestamp, and procuring entities have no authority to accept paper bids instead of electronic files.
If a contractor fails to submit an E-HSDT on e-GP before closing and delivers only a hardcopy dossier, that paper submission carries zero legal validity and cannot be opened unless the system operator officially declares a platform-wide outage with emergency remediation instructions. Where a bidder submits both online and unsolicited extra paper binders, the Evaluation Panel must evaluate strictly the online E-HSDT and ignore extraneous hardcopy supplements.
03Security Validity & Commitment Scope
The sole routine paper exception in e-procurement involves submitting an original paper bid security (when electronic bank guarantees are not used) or physical product samples specifically mandated in the E-HSMT for post-opening verification—yet even then, the guarantee must first be scanned inside the timely electronic E-HSDT.
VNTender's e-GP Operations Team recommends reminding bidders in tender notices that hardcopy bids are not accepted, while advising contractors to prepare compliant PDF files and upload E-HSDTs at least one full working day prior to closing.
Checklist for Handling Hardcopy Materials in e-GP Tenders
- Never accept or open paper dossiers as substitutes for an E-HSDT not successfully uploaded to e-GP before closing.
- Rely exclusively on electronic files downloaded from e-GP when evaluating eligibility, technical proposals, and prices.
- Accept original paper bid securities or physical samples only where explicitly requested in the E-HSMT under specified verification deadlines.
- Document the formal refusal or unopened return of any unsolicited hardcopy binders delivered outside E-HSMT rules.
Legal Basis & Regulatory Scope
Bidding Law 43/2013/QH13; Decree 63/2014/ND-CP (Articles 84 and 85); Circular 08/2022/TT-BKHDT dated 31 May 2022.