Key Takeaways
- Governing Scope: Bidding Law 22/2023/QH15 (amended by Law 90/2025/QH15); Decree 214/2025/ND-CP.
- Key Benchmark: Simplified online works quotations separately deploy Form 12E starting 1 September 2025.
- Execution Control: Check multi-lot configuration compatibility inside the selected template webform prior to E-HSMT approval.
01Regulatory Context & Core Scope
Selecting the wrong E-HSMT template code when initializing an E-TBMT on e-GP creates an irreversible error because published notices cannot switch template families mid-tender. Circular 79/2025/TT-BTC (effective 4 August 2025) reorganizes every template series across the four primary procurement sectors inside Article 4.
02Pricing Methodology & Cost Controls
For civil works under Clause 3, Article 4: Form 3A governs open bidding, restricted bidding, and competitive shopping under one-stage one-envelope procedures; Form 3B covers one-stage two-envelope tenders; and Form 3C handles e-prequalification (E-HSMST). Simplified online works quotations separately deploy Form 12E starting 1 September 2025.
For goods procurement under Clause 4: Form 4A serves one-stage one-envelope packages (including centralized procurement), Form 4B governs one-stage two-envelope packages, and Form 4C governs E-HSMST. However, medical equipment packages bundled with reagents, test consumables, and equipment-placement services must use dedicated Forms 11A and 11B under Clause 11 rather than Form 4A or 4B.
03Security Validity & Commitment Scope
For non-consulting services under Clause 5 (covering industrial cleaning, security, MEP facility O&M, urban landscaping, or off-the-shelf cloud capacity) use Form 5A (one-envelope), Form 5B (two-envelope), and Form 5C (E-HSMST), switching to Forms 12A to 12D under Clause 12 when running online quotations.
For consulting services under Clause 6: Form 6A generates one-stage two-envelope E-HSMTs, Form 6B governs E-HSMQT expressions of interest, and Form 6C serves individual consultant selection. Locking exact sector-and-method pairings inside the procurement plan guarantees accurate e-GP webform generation.
Circular 79/2025/TT-BTC Template Selection Checklist
- Match procurement plan sector classification cleanly: works (3A to 3C), goods (4A to 4C), non-consulting (5A to 5C), or consulting (6A to 6C).
- Assign medical device, reagent, and placement packages to Forms 11A and 11B rather than general goods forms.
- Verify one-envelope ('A') vs. two-envelope ('B') procedures before creating the E-TBMT workspace on e-GP.
- Use Forms 12A through 12E accurately for standard or simplified online quotation packages.
- Check multi-lot configuration compatibility inside the selected template webform prior to E-HSMT approval.
Legal Basis & Regulatory Scope
Bidding Law 22/2023/QH15 (amended by Law 90/2025/QH15); Decree 214/2025/ND-CP; Circular 79/2025/TT-BTC (Article 4).