Key Takeaways
- Governing Scope: Bidding Law 22/2023/QH15 (amended by Law 90/2025/QH15); Decree 214/2025/ND-CP.
- Key Benchmark: Clause 11 establishes Form 11A and 11B specifically for medical equipment, reagents, testing consumables, and companion equipment-placement services across public hospitals.
- Execution Control: Reference Annexes 1A through 9 to assemble compliant cover submissions, notifications, and vendor declarations.
01Regulatory Context & Core Scope
Circular 79/2025/TT-BTC, issued and effective 4 August 2025 under the Ministry of Finance, replaces Circular 22/2024/TT-BKHDT to align e-GP publication workflows and digital tender templates with Law 90/2025/QH15 and Decree 214/2025/ND-CP.
02Core Regulatory Provisions & Conditions
Article 4 structures the template suite cleanly across twelve numbered clauses: Clauses 1 and 2 govern master and individual procurement plan submissions and approvals (Forms 01A to 02B); Clauses 3 through 6 provide dedicated E-HSMT and prequalification templates for works (3A to 3C), goods (4A to 4C), non-consulting services (5A to 5C), and consulting services (6A to 6C).
Clauses 7 through 10 standardize mixed package models: EP (7A to 7C), EC (8A to 8C), PC (9A to 9C), and EPC (10A to 10C). Clause 11 establishes Form 11A and 11B specifically for medical equipment, reagents, testing consumables, and companion equipment-placement services across public hospitals.
03Pricing Methodology & Cost Controls
Clause 12 organizes the complete online quotation suite: Forms 12A and 12B (standard goods and non-consulting), Forms 12C and 12D (simplified goods and non-consulting), Form 12E (simplified works quotation effective 1 September 2025), and Form 12G (special situational tenders under Article 140 of Decree 214/2025/ND-CP), supported by compact Annexes 1A through 9.
Operationally on e-GP, standardized instruction chapters (E-CDNT) remain locked while webform integration pulls corporate financial and tax compliance records directly from national registries. Drafting teams should focus quality controls on E-BDL fields, Chapter III evaluation tables, and Chapter V technical specifications.
Circular 79/2025/TT-BTC e-GP Template Checklist
- Select the matching template code (3A through 12G) under Article 4 of Circular 79/2025/TT-BTC when creating an E-TBMT on e-GP.
- Observe the 1 September 2025 activation date specifically for Form 12E simplified online works quotations.
- Reconcile E-BDL webform entries strictly against attached Chapter III evaluation criteria and Chapter V technical requirements.
- Preserve locked standard E-CDNT wording enforced natively by the e-GP portal.
- Reference Annexes 1A through 9 to assemble compliant cover submissions, notifications, and vendor declarations.
Legal Basis & Regulatory Scope
Bidding Law 22/2023/QH15 (amended by Law 90/2025/QH15); Decree 214/2025/ND-CP; Circular 79/2025/TT-BTC (Article 4 and Annexes 1A to 9, replacing Circular 22/2024/TT-BKHDT).