Key Takeaways
- Governing Scope: Clause 2, Article 39 of Bidding Law 22/2023/QH15; Article 18 of Decree 214/2025/ND-CP (as amended by Article 1 of Decree 349/2026/ND-CP dated 9 September 2026).
- Key Benchmark: The 30% variance filter protects package budgets against inflated quotes or predatory low outliers.
- Execution Control: Archive the e-GP posting record, submitted vendor files, and price-normalization worksheet for budget appraisal and state audit.
01Regulatory Context & Core Scope
Prior to 9 September 2026, Point d, Clause 2, Article 18 of Decree 214/2025/ND-CP allowed Project Owners either to publish quotation requests on e-GP or collect market quotes through other channels with a minimum 5-day window for general goods and services. Effective 9 September 2026, Article 1 of Decree 349/2026/ND-CP overhauls Point d, Clause 2, Article 18 to standardize electronic quotation solicitation whenever market quotes are used to build a package estimate or price, while adding an outlier exclusion filter.
02Pricing Methodology & Cost Controls
Specifically, when the Project Owner chooses the Point d market-quotation basis under Clause 2, Article 18, posting a Request for Quotations on the national e-GP portal becomes mandatory, with interested suppliers submitting online via e-GP within a shortened minimum window of 3 working days for standard goods and services. Conversely, e-GP RFQ posting is not mandatory for direct unit-head purchases up to 100,000,000 VND backed by valid invoices under amended Clause 4, Article 80, packages priced completely via another independent Clause 2, Article 18 basis (approved norm-based estimates under Point a, expert cost norms under Point b, 12-month similar awards under Point c, valid valuation certificates under Point dd, lawful listed prices under Point e, or declared prices under Point g), or packages involving state-secret protection and international direct contracting.
Second, when more than one quotation is received, the Project Owner calculates the average price and may exclude any whole quotation or individual line item priced more than 30% above or below that average in order to recompute a realistic benchmark. The 30% variance filter protects package budgets against inflated quotes or predatory low outliers.
03Qualification Benchmarks & Bidder Preferences
For pharmaceuticals, reagents, medical testing consumables, medical equipment, and spare parts for medical devices, the minimum solicitation window remains 10 days on e-GP, with optional parallel posting on the Project Owner website, Ministry of Health portal, or medical device public service portal. Where two or more valid quotes are received in this healthcare category, the Project Owner retains authority to select the highest quotation that fits budget capacity and clinical needs.
Decree 349/2026/ND-CP also separates supplier and owner liability: quoting vendors bear legal responsibility for capability accuracy and compliance with competition, anti-dumping, and anti-price-gouging laws, while a Project Owner that executes transparent solicitation in full compliance is shielded from liability for vendor misconduct. Additionally, Article 18 of Decree 349/2026/ND-CP adds Point dd, Clause 1, Article 146 to build a centralized bidding price database.
Quotation Collection Rules Amended by Decree 349/2026/ND-CP
| Procurement Category | Trigger Condition & Minimum e-GP Window | Multi-Quotation Evaluation Rule |
|---|---|---|
| Standard Goods & Services (when Point d applies) | Mandatory e-GP posting >= 03 working days (exempt for <=100M VND self-decision or other Clause 2 bases) | Average price; right to exclude quotes +/- 30% from mean |
| Drugs, Reagents & Medical Devices (when Point d applies) | Mandatory e-GP posting >= 10 days (multi-channel submission allowed) | Right to select highest suitable quote when >= 02 received |
Compliant Quotation Collection Steps Under Decree 349/2026/ND-CP
- Confirm whether Point d market quotes set the package price or if an exemption applies (sub-100M-VND self-decision spending, another independent Clause 2 basis, or state-secret packages). When collecting quotes, post on e-GP for at least 3 working days (or 10 days for eligible medical items).
- Consolidate received e-GP quotes and normalize line-item specifications, VAT scope, and delivery terms.
- Compute the mean quote price and apply the 30% variance rule to exclude abnormal line items or vendor quotes before fixing the package ceiling.
- Archive the e-GP posting record, submitted vendor files, and price-normalization worksheet for budget appraisal and state audit.
Legal Basis & Regulatory Scope
Clause 2, Article 39 of Bidding Law 22/2023/QH15; Article 18 of Decree 214/2025/ND-CP (as amended by Article 1 of Decree 349/2026/ND-CP dated 9 September 2026); Article 18 of Decree 349/2026/ND-CP.