Contracts & Pricing

Managing E-HSMT Drafting, Appraisal, Bid Evaluation, and e-GP Platform Costs Under Decree 24/2024/ND-CP

Managing E-HSMT Drafting, Appraisal, Bid Evaluation, and e-GP Platform Costs Under Decree 24/2024/ND-CP
Summarizing 0.2% and 0.1% internal cost norms with VND 2M floors and VND 60M caps, plus VND 330,000 e-GP fees under Article 15 of Law 22/2023/QH15 and Article 12 of Decree 24/2024/ND-CP.

Key Takeaways

  • Governing Scope: Bidding Law 22/2023/QH15 dated 23 June 2023 (Article 15); Government Decree 24/2024/ND-CP dated 27 February 2024 (Article 12).
  • Key Benchmark: For similar repeat packages within the same project or re-tendered packages, drafting and appraisal allowances are capped at 50% of those standard limits.
  • Execution Control: Monitor annual VND 330,000 e-GP account maintenance payments so bidder status stays active prior to bid closing.

01Regulatory Context & Core Scope

Within public project management budgets, procurement administration expenses are frequently confused between internal owner committee rates and independent consulting contract fees. Article 15 of Bidding Law 22/2023/QH15 and Article 12 of Decree 24/2024/ND-CP clearly separate internal cost caps from external advisory procurement and National e-Procurement System charges.

02Pricing Methodology & Cost Controls

Where a Project Owner staffs an internal Evaluation Panel and Appraisal Unit, Article 12 of Decree 24/2024/ND-CP sets percentage ceilings based on package estimates: E-HSMT or RFP drafting is capped at 0.2% of the package price with a VND 3 million floor and VND 60 million ceiling, while E-HSDT or proposal evaluation shares the same 0.2% rate, VND 3 million floor, and VND 60 million cap.

Similarly, E-HSMT or RFP appraisal is budgeted at 0.1% with a VND 2 million floor and VND 60 million cap, matching the 0.1% rate, VND 2 million floor, and VND 60 million cap for award result appraisal. For similar repeat packages within the same project or re-tendered packages, drafting and appraisal allowances are capped at 50% of those standard limits.

03Core Regulatory Provisions & Conditions

A critical budgeting distinction arises when hiring an outside procurement consultant. External consulting fees are not bound by the 0.1% and 0.2% internal schedules; instead, they are determined through a dedicated consulting cost estimate reflecting man-months, scope complexity, and statutory expert remuneration norms.

For e-GP system fees under Clause 11, Article 12 of Decree 24/2024/ND-CP (VAT-inclusive), contractors pay VND 330,000 per year to maintain active system registration starting from the second year, VND 330,000 per bid submission for open tenders, restricted tenders, or ordinary online quotations, and VND 220,000 per submission for competitive shopping, while domestic E-HSMTs remain free to download.

Checklist for Budgeting Procurement Administration Costs

  • Separate internal panel allowances under Article 12 percentage rules from external consulting scopes priced via expert man-month budgets.
  • Verify minimum floors (VND 2 million or VND 3 million) and the VND 60 million maximum cap across drafting, appraisal, and evaluation lines.
  • Apply the 50% maximum reduction for re-tendered or repetitive similar packages under the same Project Owner.
  • Monitor annual VND 330,000 e-GP account maintenance payments so bidder status stays active prior to bid closing.

Legal Basis & Regulatory Scope

Bidding Law 22/2023/QH15 dated 23 June 2023 (Article 15); Government Decree 24/2024/ND-CP dated 27 February 2024 (Article 12).

Filed under: Contracts & Pricing #Procurement Costs #e-GP Fees #Decree 24/2024 #Article 12 Decree 24
Practical Follow-up: For package-specific inquiries, email info@vntender.com or call 0967 398 664.