The problem
- Inspection records, material certificates and test results accumulate and become difficult to check.
- Site deviations remain unresolved without consistent tracking.
- Documents that do not match completed work delay acceptance and payment.
The solution
- Check materials and site work against designs; record deviations for correction.
- Track acceptance, quality document requirements and the resolution of outstanding issues.
AI assistance
- Assist with record classification, indexing and evidence-list cross-checks; engineers inspect the site and confirm findings.
Deliverables
- Supervision report.
- Inspection/acceptance records.
- Quality record tracking.
Illustrative sampleOpen sample
0.350%–3.508%Base cost norm range
Request a quoteConstruction cost before VAT · type, size and adjustments apply.
Cost basis
Table 2.24, Appendix VIII, Circular 38/2026/TT-BXD: minimum/maximum construction supervision base norms, before adjustments. Based on construction cost before VAT in the construction package estimate.
Equipment installation and survey supervision use Tables 2.25 and 2.26; this range does not automatically apply. Define scope, duration and site conditions; contractor logs are not presented as proprietary consultant outputs.