Key Takeaways
- Method-Triggered Rule: Mandatory e-GP RFQ posting applies only when Point d market quotations are chosen as the pricing basis.
- Sub-100M Micro-Purchases: Direct unit-head purchases up to 100M VND backed by valid invoices bypass e-GP quotation postings.
- Valuation Certificates: Packages fully priced via a valid appraisal report (Point dd) or statutory engineering estimate do not need duplicate e-GP RFQs.
01How Decree 349 Links Pricing Method Choice to e-GP Posting
Since Decree 349/2026/ND-CP entered into force, accounting departments frequently misinterpret the rule as forcing every state purchase onto e-GP for quotation requests. In truth, Clause 2, Article 18 of Decree 214/2025/ND-CP (with Point d amended by Article 1 of Decree 349/2026/ND-CP) mandates publishing an e-GP Quotation Request only when the Point d market-quotation method is selected to build the package estimate or establish the package price.
02Purchases Under 100M VND and Valuation-Certificate Packages
First, for purchases or repairs not exceeding 100,000,000 VND executed via direct unit-head self-decision spending under amended Clause 4, Article 80 (raised from 50,000,000 VND by Article 6 of Decree 349/2026/ND-CP), official Ministry of Finance and Government Portal guidance confirms that units need not satisfy Clause 2 Article 79 conditions, skip simplified direct-contracting steps under Clause 3 Article 80, skip KHLCNT planning, and are exempt from e-GP Request for Quotation posting, provided spending is economical, backed by valid invoices, and never artificially split under Clause 6 Article 16 of the Bidding Law. E-GP quotation posting applies below 100 million VND only if the agency chooses to form a planned tender package priced via vendor quotes under Point d.
Second, for packages already priced via a licensed valuation certificate (Point dd, Clause 2, Article 18) or other independent bases in Clause 2, Article 18, including approved sectoral norm-based estimates (Point a), consultant cost norms (Point b), 12-month similar awarded contracts (Point c), lawful listed prices under the Law on Prices (Point e), or declared prices (Point g), those statutory bases stand independently. Therefore, where package value rests fully on a valid appraisal certificate or approved engineering budget, a duplicate e-GP Quotation Request is not required. Likewise, state-secret packages and international direct contracting occur directly without e-GP posting.
03Non-Consulting Services, Simplified Direct Appointment & Documentation Tips
Third, for non-consulting services (cleaning, security, routine maintenance, technical inspection) or goods above 100,000,000 VND, including packages eligible for simplified direct contracting under the 1B, 3B, or 5B VND caps, Ministry of Finance clarifications note that simplified direct contracting does not automatically waive e-GP RFQ posting: if no state unit rate or appraisal certificate is used and the Owner adopts Point d market quotations, a 3-working-day e-GP Quotation Request is mandatory; if Points a, c, dd, e, or g set the price, no RFQ posting is needed. Note that social-media Fanpage price sheets do not qualify as Point e listed prices, while quotes lawfully gathered before 9 September 2026 remain valid under transitional rules.
Stating clearly inside the approval submission whether the expense relies on Clause 4, Article 80 self-decision spending or a specific Point of Clause 2, Article 18 prevents unnecessary queries from internal appraisers and State Treasury reviewers. Where a remote-area 3-working-day e-GP RFQ yields zero responses, archive the posting proof before adjusting specifications to re-post or switching to another lawful Clause 2 basis.
e-GP Request for Quotation Obligation Across Common Scenarios
| Spending or Package Scenario | e-GP RFQ Mandatory | Statutory Reference |
|---|---|---|
| Direct purchase <= 100M VND (unit-head approval) | Not mandatory | Amended Clause 4, Article 80, Decree 214 |
| Package priced solely via valid appraisal certificate | Not mandatory | Point dd, Clause 2, Article 18, Decree 214 |
| Standard goods or non-consulting services via quotes | Mandatory (min 3 working days) | Amended Point d, Clause 2, Article 18, Decree 214 |
| Drugs or medical equipment via market quotes | Mandatory (min 10 calendar days) | Amended Point d, Clause 2, Article 18, Decree 214 |
Self-Check Rules for Mandatory e-GP Quotation Posting
- Determine whether the expense uses the sub-100M-VND self-decision mechanism under Clause 4, Article 80.
- Check if an approved sectoral norm-based budget or statutory tariff already establishes the price.
- When relying on an independent valuation certificate (Point dd, Clause 2, Article 18), verify its remaining validity does not exceed 6 months.
- Whenever Point d vendor quotes anchor package pricing for standard goods or non-consulting services above 100M VND, post on e-GP.
- Cite the exact Point (a, b, c, d, dd, e, or g) under Clause 2, Article 18 (or Clause 4, Article 80) inside the procurement approval submission.
Legal Basis & Regulatory Scope
Clause 2, Article 18 and Clause 4, Article 80 of Decree 214/2025/ND-CP dated 4 August 2025 (amended by Decree 349/2026/ND-CP dated 9 September 2026); Bidding Law 22/2023/QH15.