Drafting Independent E-HSMT and Award Result Appraisal Reports Under Circular 134/2026/TT-BTC Templates

Drafting Independent E-HSMT and Award Result Appraisal Reports Under Circular 134/2026/TT-BTC Templates
Practical guidance for preparing Form 3A (E-HSMT) and Form 3C (Award Result) Appraisal Reports under Circular 134/2026/TT-BTC and Articles 134 to 136 of Decree 214/2025/ND-CP.

Key Takeaways

  • Governing Scope: Clause 3, Article 44 of Bidding Law 22/2023/QH15; Articles 21, 27, 33, 134, 135, and 136 of Decree 214/2025/ND-CP (amended by Article 2 of Decree 349/2026/ND-CP).
  • Key Benchmark: Verify valid bidding certificates and strict independence between appraisal members and the E-HSMT drafting or evaluation panel.
  • Execution Control: Exclude the bidder ranking list from appraisal per Point g, Clause 1, Article 136 of Decree 214/2025/ND-CP and document any dissenting views.

01Regulatory Context & Core Scope

Under amended Bidding Law rules and Articles 27 and 136 of Decree 214/2025/ND-CP, Project Owners hold discretion on whether to appraise an E-HSMT, whereas award results for open tenders and technical shortlists in two-envelope packages require formal appraisal prior to approval. Where internal staff lack capacity or high legal scrutiny is warranted, Project Owners engage independent appraisal firms under Clause 2, Article 134 of Decree 214/2025/ND-CP and apply the uniform appraisal templates set in Clause 3, Article 2 of Circular 134/2026/TT-BTC for both online and offline tenders.

02Pricing Methodology & Cost Controls

When appraising an E-HSMT under Form 3A of Circular 134/2026/TT-BTC, reviewers complete four sections centered on Section II: Table 01 verifies six baseline input groups from project approvals, procurement plans, designs, and budgets through expert panel appointment, while Table 02 checks bidding procedures, technical requirements or terms of reference, and contract conditions. Any restrictive requirement breaching Clause 3, Article 44 of Bidding Law 22/2023/QH15 or misstating building grades under Circular 34/2026/TT-BXD is logged under Section II.2.b with a recommendation to amend prior to publication.

For award result appraisal under Form 3C of Circular 134/2026/TT-BTC, independent reviewers audit four structured tables: Table 01 checks nine statutory record sets including situation-handling decisions; Table 02 verifies nine procedural timestamps from procurement plan approval and tender notice release through clarifications and closing; Table 03 audits validity, qualification, technical, and financial evaluation compliance; and Table 04 records concurrence or dissent per stage.

03Procedural Sequence & e-GP Execution

Independent appraisal audits legal compliance and evidentiary support rather than re-scoring every bid on behalf of the evaluation panel, and explicitly excludes appraising the bidder ranking list pursuant to Point g, Clause 1, Article 136 of Decree 214/2025/ND-CP. Every dissenting opinion or re-clarification request must reference exact pages of the evaluation report, bid opening minutes, or verification minutes, preserving any minority reservations in Sections III and IV.

Appraisal panel members must satisfy qualification rules under Article 21 of Decree 214/2025/ND-CP (noting the consulting specialist certificate carve-out introduced by Article 2 of Decree 349/2026/ND-CP) and attach copies of professional bidding certificates alongside Table 1. Section VI.2 recommendations in Form 3C must state the recommended winner, proposed award price, contract type, package duration, and contract duration so the Project Owner can issue the award decision cleanly.

Independent Appraisal Quality Checklist (Forms 3A and 3C)

  • Verify valid bidding certificates and strict independence between appraisal members and the E-HSMT drafting or evaluation panel.
  • Audit all six baseline inputs in Form 3A Table 01 and all nine legal dossier sets in Form 3C Table 01.
  • Check statutory bid-preparation windows, clarification deadlines, addendum postings, and e-GP publication timestamps.
  • Screen for competition-restricting criteria under Clause 3, Article 44 of Bidding Law 22/2023/QH15, Clause 5, Article 26 of Circular 79/2025/TT-BTC, and Clause 1, Article 29 of Decree 214/2025/ND-CP.
  • Exclude the bidder ranking list from appraisal per Point g, Clause 1, Article 136 of Decree 214/2025/ND-CP and document any dissenting views.

Legal Basis & Regulatory Scope

Clause 3, Article 44 of Bidding Law 22/2023/QH15; Articles 21, 27, 33, 134, 135, and 136 of Decree 214/2025/ND-CP (amended by Article 2 of Decree 349/2026/ND-CP); Clause 5, Article 26 of Circular 79/2025/TT-BTC; Clause 3, Article 2 of Circular 134/2026/TT-BTC.

Filed under: Appraisal, Petitions & e-GP #Procurement Appraisal #Circular 134/2026 #E-HSMT #Decree 214/2025
Practical Follow-up: For package-specific inquiries, email info@vntender.com or call 0967 398 664.